E-bike Library

City of Tigard
Helping the City of Tigard launch their “Power to the Pedal” shared E-bike program
Architectural & Permanent
CNC Fabrication
Metal Work
Architectural & Permanent
CNC Fabrication
Metal Work
Vancouver Land Bridge — Village Overlook after refurbishment with new nameplates and basalt columns
Challenge

The City of Tigard was awarded a sizable grant from Portland General Electric to help launch their new bike-sharing program. The initiative was designed to give lower income residents of Tigard access to free e-bikes and support the City’s vision of an equitable community that is walkable, healthy, and accessible for everyone, in part by increasing access to shared electric micro-mobility.

And they needed a safe and secure, lockable “library” to house and charge the bikes at select locations.

‍

Solution

Our design team developed a cost-effective and practical, permanent structure that could be deployed in most any location, creating a repeatable and affordable facility to serve the needs of the program.

‍

Results

Four easily accessible bike lockers with custom locking posts and charging stations to keep the bikes secure and provide a visible staging area for safe arrival and departure.

Figure Plant E-bike Library in Tigard with four lockable bike lockers and integrated charging stations for shared electric bikes.City of Tigard ‘Power to the Pedal’ E-bike Library featuring secure, accessible lockers and charging stations designed by Figure Plant.Shared E-bike station in Tigard with custom lockable lockers and charging posts, supporting safe, equitable micro-mobility.
No items found.
Related Case Studies

For new or existing business, or just to say hello, we’d love to hear from you.

Get in touch

Reach Out Here